In my post of 3 November, which followed the rejection of the Heritage Homes plans for an office block, I wondered how soon they’d be back. The answer is one month. They are now applying to build a block of flats in the same place and of about the same size as the proposed office block. You can find the full details here.

You must be logged in to leave a reply.